Matthew Murray Sports Hub • Live Progress Viewer

Matthew Murray Sports Hub.
Progress data in one place.

The 11 November 2026 pre-construction baseline for CLS Sports, bringing site evolution, high-resolution orthophoto and DSM, 3D model, flyover video and aerial imagery together in one browser-based project record.

CLS Sports logo
Vista Metrics logo
Latest capture11 November 2026
Capture cycleFortnightly updates

Capture archive

The 11 November 2026 baseline is the first survey. Future visits can be added here and will update the mapped capture, 3D model, video and gallery while building a dated progress history.

● Live project record
Prepared forCLS Sports
SiteMatthew Murray Sports Hub, Leeds
Latest mapped capture11.11.26
Viewer purposePre-construction baseline and future progress evidence

Site Evolution

The 11 November survey establishes the pre-construction baseline. View the whole-site image or DSM; the dated evolution timeline will grow as future captures are added.

11 November 2026
Whole site • 11 November 2026 baseline
Pre-construction baseline recorded on 11 November 2026.
Download current evolution image

Interactive Workspace

Explore the georeferenced 11 November pre-construction baseline. Compare the orthophoto and DSM, measure distances in metres and areas in m², and add notes or site symbols.

11 November 2026 baseline
Orthophoto · 11 November 2026
DSM · 11 November 2026
Opening the georeferenced workspace…
OrthophotoDSM

Latest Orthophoto / DSM

Drag the divider across the mapped capture to switch directly between the latest orthophoto and digital surface model.

11.11.26
11 November 2026 orthophoto 11 November 2026 DSM
DSM
Orthophoto
DSM • surface contextOrthophoto • mapped site record
Download orthophoto Download DSM

Interactive 3D Site Model

Rotate, pan and inspect the Matthew Murray Sports Hub pre-construction model from 11 November 2026. Zoom in for greater detail while keeping the camera above the model.

11.11.26
Left drag to rotate • Right drag to pan • Scroll to zoom • View restricted above the model
Download 3D model

Video Flyover

A visual flyover from the Matthew Murray Sports Hub pre-construction baseline survey on 11 November 2026.

11.11.26
Download flyover video

Project context

This progress viewer has been prepared by Vista Metrics for CLS Sports and brings the project capture record into one shareable link.

Future surveys can be added to this viewer without changing the link shared with the project team.