The 11 November 2026 pre-construction baseline for CLS Sports, bringing site evolution, high-resolution orthophoto and DSM, 3D model, flyover video and aerial imagery together in one browser-based project record.


The 11 November 2026 baseline is the first survey. Future visits can be added here and will update the mapped capture, 3D model, video and gallery while building a dated progress history.
The 11 November survey establishes the pre-construction baseline. View the whole-site image or DSM; the dated evolution timeline will grow as future captures are added.
Explore the georeferenced 11 November pre-construction baseline. Compare the orthophoto and DSM, measure distances in metres and areas in m², and add notes or site symbols.
Drag the divider across the mapped capture to switch directly between the latest orthophoto and digital surface model.
Rotate, pan and inspect the Matthew Murray Sports Hub pre-construction model from 11 November 2026. Zoom in for greater detail while keeping the camera above the model.
A visual flyover from the Matthew Murray Sports Hub pre-construction baseline survey on 11 November 2026.
Selected overview imagery from the latest visit. Open any image for a clean full-screen view or download it directly.
This progress viewer has been prepared by Vista Metrics for CLS Sports and brings the project capture record into one shareable link.





Future surveys can be added to this viewer without changing the link shared with the project team.